Question 1 of 215
Category: APMF – Icons and legends
Sort the steps to interpret icon meanings.
Reorder
Identify icon type
Move "Identify icon type" down
Move "Identify icon type" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Compare with activity status
Move "Compare with activity status" down
Move "Compare with activity status" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Adjust planning if needed
Move "Adjust planning if needed" down
Move "Adjust planning if needed" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Check the legend
Move "Check the legend" down
Move "Check the legend" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Question 2 of 215
Category: APMF – Hours and progress
Sort the steps to enable estimated planning status.
Reorder
Open chart preferences
Move "Open chart preferences" down
Move "Open chart preferences" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Review color-coded progress bars
Move "Review color-coded progress bars" down
Move "Review color-coded progress bars" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Apply changes
Move "Apply changes" down
Move "Apply changes" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Enable estimated planning toggle
Move "Enable estimated planning toggle" down
Move "Enable estimated planning toggle" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Question 3 of 215
Category: APMF – Solution introduction
Arrange the steps of project task planning in the correct order.
Reorder
Publish
Move "Publish" down
Move "Publish" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Create a draft
Move "Create a draft" down
Move "Create a draft" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Apply changes
Move "Apply changes" down
Move "Apply changes" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Manage versions
Move "Manage versions" down
Move "Manage versions" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Question 4 of 215
Category: APMF – Introduction and agenda
Match the project features with their respective functionalities.
Identifying key project milestones and activities
Show activities based on a certain status
Estimate the project planning and check resource availability
Understanding project icons
Critical Path
Correct
Incorrect
Correct answer
Filters
Correct
Incorrect
Correct answer
Project Quotations
Correct
Incorrect
Correct answer
Legend
Correct
Incorrect
Correct answer
Question 5 of 215
Category: APMF – Edit Assignment Form
Sort the steps to reassign hours to a different resource.
Reorder
Confirm changes
Move "Confirm changes" down
Move "Confirm changes" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Reallocate hours
Move "Reallocate hours" down
Move "Reallocate hours" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Choose a different resource
Move "Choose a different resource" down
Move "Choose a different resource" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Select the assigned hours
Move "Select the assigned hours" down
Move "Select the assigned hours" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Question 6 of 215
Category: APMF – Introduction Resource planning
Match resource planning elements with their descriptions.
Defines which type of resource is needed for a task
Specifies the total work period for a task
Indicates how much capacity a resource is using
Visually distinguishes different projects
Resource Role
Correct
Incorrect
Correct answer
Task Duration
Correct
Incorrect
Correct answer
Utilization Percentage
Correct
Incorrect
Correct answer
Project Color Code
Correct
Incorrect
Correct answer
Question 7 of 215
Category: APMF – Task planning
What “source” is used when creating a task planning?
Question 8 of 215
Category: APMF – Compare with a baseline
Arrange the steps to create and use a baseline.
Reorder
Compare changes
Move "Compare changes" down
Move "Compare changes" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Publish task planning
Move "Publish task planning" down
Move "Publish task planning" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Select baseline version
Move "Select baseline version" down
Move "Select baseline version" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Enable baseline toggle
Move "Enable baseline toggle" down
Move "Enable baseline toggle" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Question 9 of 215
Category: APMF – View options
Match chart preferences with their settings.
Define small and large time scales
Set start and end date
Apply selection criteria
Enable visual indicators
Time Intervals
Correct
Incorrect
Correct answer
View Range
Correct
Incorrect
Correct answer
Filters
Correct
Incorrect
Correct answer
Icons
Correct
Incorrect
Correct answer
Question 10 of 215
Category: APMF – View options
Match view options with their purpose.
Focus on task details
Adjust to show full plan
Jump to current date
Remove weekends from view
Zoom In
Correct
Incorrect
Correct answer
Fit to View
Correct
Incorrect
Correct answer
Scroll to Today
Correct
Incorrect
Correct answer
Hide Non-Working Time
Correct
Incorrect
Correct answer
Question 11 of 215
Category: APMF – Chart preferences
What can be configured in Chart Preferences?
Question 12 of 215
Category: APMF – Introduction Resource planning
Match resource planning statuses with their meanings.
All required hours are allocated
Some allocated hours are missing
No resource has been assigned to the task
Assigned hours exceed available capacity
Fully Staffed
Correct
Incorrect
Correct answer
Partially Staffed
Correct
Incorrect
Correct answer
Unassigned
Correct
Incorrect
Correct answer
Overloaded
Correct
Incorrect
Correct answer
Question 13 of 215
Category: APMF – Capacity overview
Which three kinds of information are shown in Capacity Overview?
Select all three correct answers to score the point.
Question 14 of 215
Category: APMF – Task planning
Which options are available in task planning?
Select all three correct answers to score the point.
Question 15 of 215
Category: APMF – Project Quotations
Arrange the steps to include a project quotation in capacity planning.
Reorder
Enable soft reservations
Move "Enable soft reservations" down
Move "Enable soft reservations" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Create a project quotation
Move "Create a project quotation" down
Move "Create a project quotation" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Review impact in capacity overview
Move "Review impact in capacity overview" down
Move "Review impact in capacity overview" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Define probability threshold
Move "Define probability threshold" down
Move "Define probability threshold" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Question 16 of 215
Category: APMF – Project Quotations
Match project quotation actions with their effects.
Includes tentative hours in planning
Modifies when quotations are included
Assigns staff based on quotation details
Identifies workload adjustments
Enable Soft Reservations
Correct
Incorrect
Correct answer
Adjust Threshold
Correct
Incorrect
Correct answer
Allocate Resources
Correct
Incorrect
Correct answer
Review Utilization
Correct
Incorrect
Correct answer
Question 17 of 215
Category: APMF – Introduction Resource planning
Which drag actions can be used in resource planning?
Please select the three correct answers to score the point.
Question 18 of 215
Category: APMF – Sub and Multiple Projects
What is required to display subprojects in task planning?
Question 19 of 215
Category: APMF – Progress Calculation Method
Which values are considered in progress calculation?
Select the three correct answers to score the point.
Question 20 of 215
Category: APMF – Compare with a baseline
Match baseline elements with their functions.
Enables saving of baseline version
Shows differences between versions
Current live version of the plan
Highlights modifications made
Baseline Toggle
Correct
Incorrect
Correct answer
Compare Baseline
Correct
Incorrect
Correct answer
Published Plan
Correct
Incorrect
Correct answer
Task Changes
Correct
Incorrect
Correct answer
Question 21 of 215
Category: APMF – Hours and progress
Arrange the steps to post hours in an hour journal.
Reorder
Post hours and confirm
Move "Post hours and confirm" down
Move "Post hours and confirm" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Open the hour journal
Move "Open the hour journal" down
Move "Open the hour journal" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Select the activity and set the number of hours
Move "Select the activity and set the number of hours" down
Move "Select the activity and set the number of hours" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Create a new entry
Move "Create a new entry" down
Move "Create a new entry" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Question 22 of 215
Category: APMF – Icons and legends
Arrange the steps to filter activities in task planning.
Reorder
Select filter criteria
Move "Select filter criteria" down
Move "Select filter criteria" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Apply and review results
Move "Apply and review results" down
Move "Apply and review results" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Open task planning
Move "Open task planning" down
Move "Open task planning" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Enable filter options
Move "Enable filter options" down
Move "Enable filter options" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Question 23 of 215
Category: APMF – Introduction Resource planning
Which view is used to manage resources without focusing on projects?
Question 24 of 215
Category: APMF – Task planning
What does the task planning include?
Select all three correct answers to score the point.
Question 25 of 215
Category: APMF – Sub and Multiple Projects
What happens when subprojects are enabled in task planning?
Select both correct answers to score the point.
Question 26 of 215
Category: APMF – Chart preferences
Sort the steps for adjusting item tracking icons.
Reorder
Enable item tracking toggle
Move "Enable item tracking toggle" down
Move "Enable item tracking toggle" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Open Chart Preferences
Move "Open Chart Preferences" down
Move "Open Chart Preferences" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Apply changes
Move "Apply changes" down
Move "Apply changes" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Select icon display options
Move "Select icon display options" down
Move "Select icon display options" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Question 27 of 215
Category: APMF – Create new tasks
Which actions can be performed when creating new tasks?
Select the three correct answers to score the point.
Question 28 of 215
Category: APMF – Item Requirements and Item Tracking
Which statuses can be tracked for item availability?
Select the three correct answers to score the point.
Question 29 of 215
Category: APMF – Compare with a baseline
Match actions with their effects in baseline comparison.
Stores published version for future use
Loads a previous version for comparison
Marks differences between versions
Restores an older baseline version
Enable Baseline
Correct
Incorrect
Correct answer
Select Baseline
Correct
Incorrect
Correct answer
Highlight Changes
Correct
Incorrect
Correct answer
Revert Plan
Correct
Incorrect
Correct answer
Question 30 of 215
Category: APMF – Introduction Resource planning
What is a partially staffed task?
Question 31 of 215
Category: APMF – Schedule Tasks and Planning
Arrange the steps to include a project quotation in capacity planning.
Reorder
Define probability threshold
Move "Define probability threshold" down
Move "Define probability threshold" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Create a project quotation
Move "Create a project quotation" down
Move "Create a project quotation" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Review impact in capacity overview
Move "Review impact in capacity overview" down
Move "Review impact in capacity overview" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Enable soft reservations
Move "Enable soft reservations" down
Move "Enable soft reservations" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Question 32 of 215
Category: APMF – Schedule Tasks and Planning
Where are project quotations integrated?
Question 33 of 215
Category: APMF – Critical path
Which factors determine the critical path?
Select all three correct answers to score the point.
Question 34 of 215
Category: APMF – Update Assignments on Publish
Which options are available when updating assignments on publish?
Select the three correct answers to score the point.
Question 35 of 215
Category: APMF – Sub and Multiple Projects
Match subproject actions with their effects.
Displays subprojects within the main project view
Allows editing multiple projects at once
Establishes dependencies between different projects
Saves and applies changes to all linked projects
Enable Subprojects
Correct
Incorrect
Correct answer
Create Multi-Draft
Correct
Incorrect
Correct answer
Link Tasks
Correct
Incorrect
Correct answer
Publish All
Correct
Incorrect
Correct answer
Question 36 of 215
Category: APMF – Item Requirements and Item Tracking
Match item requirement processes with their functions.
Converts estimates into real item requirements
Orders materials for the project
Displays availability status in task planning
Confirms that ordered items have arrived
Transfer from WBS
Correct
Incorrect
Correct answer
Create Purchase Order
Correct
Incorrect
Correct answer
Enable Item Tracking
Correct
Incorrect
Correct answer
Product Receipt
Correct
Incorrect
Correct answer
Question 37 of 215
Category: APMF – Allocation distribution
How can allocation percentages be defined?
Question 38 of 215
Category: APMF – Sub and Multiple Projects
What must be created to edit multiple projects simultaneously?
Question 39 of 215
Category: APMF – Introduction and agenda
What does the task planning section cover?
Question 40 of 215
Category: APMF – Competencies
What is the role of competencies in task planning?
Question 41 of 215
Category: APMF – Progress Calculation Method
Which two main progress calculation methods are available?
Question 42 of 215
Category: APMF – Solution introduction
What is one key benefit of the project management solution?
Question 43 of 215
Category: APMF – Capacity overview
Arrange the steps to check resource availability.
Reorder
Review utilization percentage
Move "Review utilization percentage" down
Move "Review utilization percentage" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Open Capacity Overview
Move "Open Capacity Overview" down
Move "Open Capacity Overview" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Select resource role
Move "Select resource role" down
Move "Select resource role" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Allocate resources if needed
Move "Allocate resources if needed" down
Move "Allocate resources if needed" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Question 44 of 215
Category: APMF – Sub and Multiple Projects
Match project linking options with their functions.
Displays subprojects in the main project timeline
Allows different projects to be viewed together
Creates a multi-draft for all selected projects
Ensures that linked activities maintain scheduling constraints
Show Subprojects
Correct
Incorrect
Correct answer
Include Linked Projects
Correct
Incorrect
Correct answer
Edit All
Correct
Incorrect
Correct answer
Task Dependencies
Correct
Incorrect
Correct answer
Question 45 of 215
Category: APMF – Capacity simulation
What insights can be gained from Capacity Simulation?
Select all three correct answers to score the point.
Question 46 of 215
Category: APMF – Project Quotations
Match project quotation elements with their descriptions.
Proposal containing planned tasks and resources
Minimum chance before integration in capacity
Tentative allocation affecting utilization
Displays impact of quotations on resource workload
Project Quote
Correct
Incorrect
Correct answer
Probability Threshold
Correct
Incorrect
Correct answer
Soft Reservations
Correct
Incorrect
Correct answer
Capacity Overview
Correct
Incorrect
Correct answer
Question 47 of 215
Category: APMF – Capacity overview
How can you filter resources in Capacity Overview?
Question 48 of 215
Category: APMF – Hours and progress
What does the gray progress bar on an activity in the task planning indicate?
Question 49 of 215
Category: APMF – Histogram Icons and Filters
Match histogram colors with their meanings.
Fully utilized resource
Partially staffed task
Overloaded resource
Unassigned hours
Green
Correct
Incorrect
Correct answer
Yellow
Correct
Incorrect
Correct answer
Red
Correct
Incorrect
Correct answer
Gray
Correct
Incorrect
Correct answer
Question 50 of 215
Category: APMF – Icons and legends
Match filters with their functions.
Shows tasks based on completion percentage
Highlights fully or partially staffed tasks
Filters based on material availability
Displays tasks exceeding financial limits
Task Progress
Correct
Incorrect
Correct answer
Resource Availability
Correct
Incorrect
Correct answer
Item Tracking
Correct
Incorrect
Correct answer
Budget Status
Correct
Incorrect
Correct answer
Question 51 of 215
Category: APMF – Progress Calculation Method
Sort the steps for switching between progress methods.
Reorder
Open the planning parameters
Move "Open the planning parameters" down
Move "Open the planning parameters" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Check the updated numbers in the task planning
Move "Check the updated numbers in the task planning" down
Move "Check the updated numbers in the task planning" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Choose effort-based or performance-based
Move "Choose effort-based or performance-based" down
Move "Choose effort-based or performance-based" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Open the task planning
Move "Open the task planning" down
Move "Open the task planning" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Question 52 of 215
Category: APMF – Competencies
Sort the steps for setting up competencies in HR.
Reorder
Assign competency certification
Move "Assign competency certification" down
Move "Assign competency certification" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Verify competency requirements
Move "Verify competency requirements" down
Move "Verify competency requirements" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Open employee profile
Move "Open employee profile" down
Move "Open employee profile" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Enable competency-based resource allocation
Move "Enable competency-based resource allocation" down
Move "Enable competency-based resource allocation" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Question 53 of 215
Category: APMF – Capacity overview
Which three filters are available in Capacity Overview?
Select all three correct answers to score the point.
Question 54 of 215
Category: APMF – Compare with a baseline
What is a baseline in task planning?
Question 55 of 215
Category: APMF – Task planning
Arrange the steps for setting up task planning.
Reorder
Publish planning
Move "Publish planning" down
Move "Publish planning" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Define tasks
Move "Define tasks" down
Move "Define tasks" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Set dependencies
Move "Set dependencies" down
Move "Set dependencies" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Create a project
Move "Create a project" down
Move "Create a project" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Question 56 of 215
Category: APMF – Task planning
Match planning features with their function.
Arranging task timelines
Defining task relationships
Assigning workers
Viewing specific tasks
Scheduling
Correct
Incorrect
Correct answer
Dependencies
Correct
Incorrect
Correct answer
Resource Allocation
Correct
Incorrect
Correct answer
Filtering
Correct
Incorrect
Correct answer
Question 57 of 215
Category: APMF – Critical path
How can the critical path be recalculated?
Question 58 of 215
Category: APMF – Schedule Tasks and Planning
What happens when a project quote exceeds the probability threshold?
Question 59 of 215
Category: APMF – Introduction Resource planning
Sort the steps to balance resource workload.
Reorder
Open the resource planning
Move "Open the resource planning" down
Move "Open the resource planning" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Confirm changes
Move "Confirm changes" down
Move "Confirm changes" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Identify overloaded resources
Move "Identify overloaded resources" down
Move "Identify overloaded resources" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Adjust resource allocation
Move "Adjust resource allocation" down
Move "Adjust resource allocation" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Question 60 of 215
Category: APPF – Filters
Match filter types with their functions.
Displays only overloaded resources
Shows fully or partially staffed tasks
Filters tasks based on completion percentage
Highlights available or unavailable resources
Overload Filter
Correct
Incorrect
Correct answer
Staffing Status
Correct
Incorrect
Correct answer
Task Progress Filter
Correct
Incorrect
Correct answer
Resource Availability
Correct
Incorrect
Correct answer
Question 61 of 215
Category: APMF – Task planning
What is the logical order when setting up a project plan?
Reorder
Summary task
Move "Summary task" down
Move "Summary task" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Project
Move "Project" down
Move "Project" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Sub task
Move "Sub task" down
Move "Sub task" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Task
Move "Task" down
Move "Task" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Question 62 of 215
Category: APMF – Introduction Resource planning
What affects workload balancing in resource planning?
Please select the three correct answers to score the point.
Question 63 of 215
Category: APMF – Update Assignments on Publish
Arrange the steps to reassign hours after moving an activity.
Reorder
Move the activity in task planning
Move "Move the activity in task planning" down
Move "Move the activity in task planning" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Review remaining unallocated hours
Move "Review remaining unallocated hours" down
Move "Review remaining unallocated hours" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Select 'Reassign to New Period' on publish
Move "Select 'Reassign to New Period' on publish" down
Move "Select 'Reassign to New Period' on publish" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Manually adjust assignments as needed
Move "Manually adjust assignments as needed" down
Move "Manually adjust assignments as needed" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Question 64 of 215
Category: APMF – Capacity simulation
What is the purpose of Capacity Simulation?
Question 65 of 215
Category: APMF – Project Quotations
Sort the steps to adjust capacity based on project quotations.
Reorder
Enable project quotation integration
Move "Enable project quotation integration" down
Move "Enable project quotation integration" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Open resource planning
Move "Open resource planning" down
Move "Open resource planning" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Analyze utilization percentage
Move "Analyze utilization percentage" down
Move "Analyze utilization percentage" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Reallocate resources if needed
Move "Reallocate resources if needed" down
Move "Reallocate resources if needed" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Question 66 of 215
Category: APMF – Histogram Icons and Filters
What does the histogram in resource planning show?
Question 67 of 215
Category: APMF – Competencies
Arrange the steps to allocate resources based on competency.
Reorder
Assign resource to task
Move "Assign resource to task" down
Move "Assign resource to task" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Publish resource plan
Move "Publish resource plan" down
Move "Publish resource plan" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Define required competence for the activity
Move "Define required competence for the activity" down
Move "Define required competence for the activity" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Check available resources
Move "Check available resources" down
Move "Check available resources" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Question 68 of 215
Category: APMF – Intercompany projects
Match intercompany project actions with their effects.
Displays linked projects across entities
Modifies task connections without restrictions
Allows shared task management
Removes linked projects from task planning
Enable Intercompany View
Correct
Incorrect
Correct answer
Adjust Soft Link
Correct
Incorrect
Correct answer
Assign Tasks
Correct
Incorrect
Correct answer
Hide Intercompany Tasks
Correct
Incorrect
Correct answer
Question 69 of 215
Category: APMF – Introduction and agenda
Match the project management concepts with their correct descriptions.
Creating work breakdown structures
Allocating tasks to available staff
Displays available vs. allocated hours
See item availability related to purchase orders
Task Planning
Correct
Incorrect
Correct answer
Resource Planning
Correct
Incorrect
Correct answer
Capacity Overview
Correct
Incorrect
Correct answer
Item Tracking
Correct
Incorrect
Correct answer
Question 70 of 215
Category: APMF – Schedule Tasks and Planning
Which elements can be allocated in project quotations?
Select the three correct answers to score the point.
Question 71 of 215
Category: APMF – Allocation distribution
What can be done in planning parameters for allocation distribution?
Select all three correct answers to score the point.
Question 72 of 215
Category: APMF – Solution introduction
Arrange the setup steps for project management configuration.
Reorder
Set up task planning
Move "Set up task planning" down
Move "Set up task planning" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Configure reporting
Move "Configure reporting" down
Move "Configure reporting" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Enable resource planning
Move "Enable resource planning" down
Move "Enable resource planning" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Define project parameters
Move "Define project parameters" down
Move "Define project parameters" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Question 73 of 215
Category: APMF – Critical path
Match critical path actions with their effects.
Highlights critical tasks in planning
Modifies sequence of tasks
Updates critical path automatically
Expands critical path analysis
Enable Critical Path
Correct
Incorrect
Correct answer
Adjust Dependencies
Correct
Incorrect
Correct answer
Recalculate on Publish
Correct
Incorrect
Correct answer
Include Subprojects
Correct
Incorrect
Correct answer
Question 74 of 215
Category: APMF – Chart preferences
Match chart elements with their functions.
Indicates planned vs. actual effort
Highlights workload status
Displays material availability
Shows financial constraints
Estimated Planning
Correct
Incorrect
Correct answer
Resource Availability
Correct
Incorrect
Correct answer
Item Tracking
Correct
Incorrect
Correct answer
Budget Status
Correct
Incorrect
Correct answer
Question 75 of 215
Category: APMF – Project Quotations
How can project quotations impact resource planning?
Select the three correct answers to score the point.
Question 76 of 215
Category: APMF – Icons and legends
Which factors influence icon display in task planning?
Select the three correct answers to score the point.
Question 77 of 215
Category: APMF – Draft and publish
Arrange the version control steps for task planning.
Reorder
Compare with previous versions
Move "Compare with previous versions" down
Move "Compare with previous versions" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Create a new version
Move "Create a new version" down
Move "Create a new version" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Make edits
Move "Make edits" down
Move "Make edits" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Publish
Move "Publish" down
Move "Publish" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Question 78 of 215
Category: APMF – Chart preferences
Arrange the steps to configure a Gantt chart.
Reorder
Save preferences
Move "Save preferences" down
Move "Save preferences" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Select period view
Move "Select period view" down
Move "Select period view" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Enable necessary toggles
Move "Enable necessary toggles" down
Move "Enable necessary toggles" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Open chart preferences
Move "Open chart preferences" down
Move "Open chart preferences" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Question 79 of 215
Category: APMF – Capacity simulation
Which actions can you perform in Capacity Simulation?
Select all three correct answers to score the point.
Question 80 of 215
Category: APMF – Update Assignments on Publish
What does the ‘Cancel Assignments’ option do when publishing?
Question 81 of 215
Category: APMF – View options
What settings can be configured in chart preferences?
Select all three correct answers to score the point.
Question 82 of 215
Category: APMF – Edit Assignment Form
How can you assign hours using the Edit Assignment Form?
Question 83 of 215
Category: APMF – Draft and publish
Match draft-related features with their descriptions.
Edit multiple tasks quickly
Manage different versions
Move between draft versions
Set as the main working version
Bulk Edit
Correct
Incorrect
Correct answer
Multiple Drafts
Correct
Incorrect
Correct answer
Switch Draft
Correct
Incorrect
Correct answer
Primary Draft
Correct
Incorrect
Correct answer
Question 84 of 215
Category: APMF – Intercompany projects
What type of link is created between intercompany projects?
Question 85 of 215
Category: APMF – Solution introduction
Match the project data types with their usage.
Employee allocation
Budgeting and cost tracking
Supplier management
Inventory tracking
HR Data
Correct
Incorrect
Correct answer
Financial Data
Correct
Incorrect
Correct answer
Procurement Data
Correct
Incorrect
Correct answer
Logistics Data
Correct
Incorrect
Correct answer
Question 86 of 215
Category: APMF – Chart preferences
Which settings can be toggled in Chart Preferences?
Select all three correct answers to score the point.
Question 87 of 215
Category: APMF – Create new tasks
Match task editing actions with their effects.
Moves a task under a summary task
Moves a task to a higher level
Adjusts total task length
Links a task to a specific project type
Indent Task
Correct
Incorrect
Correct answer
Outdent Task
Correct
Incorrect
Correct answer
Modify Duration
Correct
Incorrect
Correct answer
Assign Category
Correct
Incorrect
Correct answer
Question 88 of 215
Category: APMF – Edit Assignment Form
Which functions are available in the Edit Assignment Form?
Select the three correct answers to score the point.
Question 89 of 215
Category: APMF – Draft and publish
Arrange the steps in the draft and publish process.
Reorder
Review changes
Move "Review changes" down
Move "Review changes" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Apply changes
Move "Apply changes" down
Move "Apply changes" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Create draft
Move "Create draft" down
Move "Create draft" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Publish
Move "Publish" down
Move "Publish" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Question 90 of 215
Category: APMF – Task planning
Match task elements with their purpose.
Grouping related tasks
Deadline or Goal
Activity in the project plan
Linking activities
Summary Task
Correct
Incorrect
Correct answer
Milestone
Correct
Incorrect
Correct answer
Task
Correct
Incorrect
Correct answer
Dependency
Correct
Incorrect
Correct answer
Question 91 of 215
Category: APMF – Edit Assignment Form
Match Edit Assignment Form actions with their effects.
Removes assigned hours from a resource
Moves hours from one resource to another
Displays task duration, assigned/unassigned hours
Allocates full work hours to a task
Cancel Assignment
Correct
Incorrect
Correct answer
Reassign Hours
Correct
Incorrect
Correct answer
View General Info
Correct
Incorrect
Correct answer
Apply Full Capacity
Correct
Incorrect
Correct answer
Question 92 of 215
Category: APMF – Introduction Resource planning
How can a resource manager view all assigned activities?
Question 93 of 215
Category: APMF – Hours and progress
Match progress bar colors with their meanings.
Progress if estimated planning status is disabled
On effort
<10% over effort
>10% over effort
Gray
Correct
Incorrect
Correct answer
Green
Correct
Incorrect
Correct answer
Light red
Correct
Incorrect
Correct answer
Dark read
Correct
Incorrect
Correct answer
Question 94 of 215
Category: APMF – View options
What does the ‘Scroll to Today’ function do?
Question 95 of 215
Category: APMF – Chart preferences
What does the show_task_toggle control?
Question 96 of 215
Category: APMF – Icons and legends
What does an icon with a triangle represent?
Question 97 of 215
Category: APMF – Introduction and agenda
Arrange the following steps in project task planning in the correct order.
Reorder
Add tasks and milestones
Move "Add tasks and milestones" down
Move "Add tasks and milestones" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Schedule tasks
Move "Schedule tasks" down
Move "Schedule tasks" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Link activities
Move "Link activities" down
Move "Link activities" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Create summary tasks
Move "Create summary tasks" down
Move "Create summary tasks" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Question 98 of 215
Category: APMF – Allocation distribution
Arrange the steps to apply an allocation distribution in order.
Reorder
Select activity in task planning
Move "Select activity in task planning" down
Move "Select activity in task planning" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Publish task planning
Move "Publish task planning" down
Move "Publish task planning" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Apply allocation distribution
Move "Apply allocation distribution" down
Move "Apply allocation distribution" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Create allocation reference
Move "Create allocation reference" down
Move "Create allocation reference" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Question 99 of 215
Category: APMF – Introduction Resource planning
Match drag actions with their effects.
Assigns max available hours per day
Uses only unallocated hours
Spreads hours evenly over available days
Allocates a defined percentage of workload
Full Capacity
Correct
Incorrect
Correct answer
Remaining Capacity
Correct
Incorrect
Correct answer
Distribute
Correct
Incorrect
Correct answer
Capacity Percentage
Correct
Incorrect
Correct answer
Question 100 of 215
Category: APMF – Histogram Icons and Filters
Which filters are available in resource planning?
Select the three correct answers to score the point.
Question 101 of 215
Category: APMF – Compare with a baseline
How do you create a baseline?
Question 102 of 215
Category: APMF – Edit Assignment Form
What is the purpose of the Edit Assignment Form?
Question 103 of 215
Category: APMF – Item Requirements and Item Tracking
Match item tracking icons with their meanings.
Item available and received
Item ordered but not received yet
Item delayed or missing
Item has been picked in a picking list
Green
Correct
Incorrect
Correct answer
Orange
Correct
Incorrect
Correct answer
Red
Correct
Incorrect
Correct answer
Blue
Correct
Incorrect
Correct answer
Question 104 of 215
Category: APMF – Introduction and agenda
What are key features of resource planning?
Select all three correct answers to score the point.
Question 105 of 215
Category: APMF – Progress Calculation Method
How does the performance-based method differ from effort-based?
Select both correct answers to score the point.
Question 106 of 215
Category: APMF – Solution introduction
What type of data is integrated into the project management solution?
Question 107 of 215
Category: APMF – Create new tasks
Match task creation features with their functions.
Groups multiple tasks under one header
Creates hierarchy in task planning
Splits a task into separate parts
Creates a new task from split data
Summary Task
Correct
Incorrect
Correct answer
Task Indentation
Correct
Incorrect
Correct answer
Cut Action
Correct
Incorrect
Correct answer
Paste Action
Correct
Incorrect
Correct answer
Question 108 of 215
Category: APMF – Introduction Resource planning
Sort the steps to apply a capacity percentage assignment.
Reorder
Select the percentage and confirm
Move "Select the percentage and confirm" down
Move "Select the percentage and confirm" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Drag the activity to the resource
Move "Drag the activity to the resource" down
Move "Drag the activity to the resource" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Select the resources in the resource planning
Move "Select the resources in the resource planning" down
Move "Select the resources in the resource planning" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Select the correct drag-action
Move "Select the correct drag-action" down
Move "Select the correct drag-action" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Question 109 of 215
Category: APMF – Histogram Icons and Filters
Sort the steps to interpret histogram colors.
Reorder
Identify color representation
Move "Identify color representation" down
Move "Identify color representation" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Analyze resource availability
Move "Analyze resource availability" down
Move "Analyze resource availability" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Check staffing icons
Move "Check staffing icons" down
Move "Check staffing icons" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Adjust allocation if needed
Move "Adjust allocation if needed" down
Move "Adjust allocation if needed" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Question 110 of 215
Category: APMF – View options
Which view adjustments can be made?
Select all three correct answers to score the point.
Question 111 of 215
Category: APMF – Compare with a baseline
Which actions can be performed with baselines?
Select all three correct answers to score the point.
Question 112 of 215
Category: APMF – Introduction Resource planning
What is the effect of using ‘Full Capacity’ when assigning tasks?
Question 113 of 215
Category: APMF – Draft and publish
What can you do when working with multiple drafts?
Select all three correct answers to score the point.
Question 114 of 215
Category: APMF – Icons and legends
Match icons with their meanings.
Item tracking status
Task completed
Over budget or resource overload
Pending approval or delayed task
Triangle
Correct
Incorrect
Correct answer
Green checkmark
Correct
Incorrect
Correct answer
Red warning
Correct
Incorrect
Correct answer
Clock icon
Correct
Incorrect
Correct answer
Question 115 of 215
Category: APMF – Competencies
Where can competencies be assigned?
Select the two correct answers to score the point.
Question 116 of 215
Category: APMF – Draft and publish
What is the purpose of draft mode in task planning?
Question 117 of 215
Category: APMF – Histogram Icons and Filters
Arrange the steps to filter overloaded resources.
Reorder
Open resource planning
Move "Open resource planning" down
Move "Open resource planning" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Review filtered results
Move "Review filtered results" down
Move "Review filtered results" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Enable resource availability
Move "Enable resource availability" down
Move "Enable resource availability" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Apply overload filter
Move "Apply overload filter" down
Move "Apply overload filter" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Question 118 of 215
Category: APMF – Introduction Resource planning
What is the benefit of using allocation distribution?
Question 119 of 215
Category: APMF – Schedule Tasks and Planning
Match project quotation elements with their descriptions.
Proposal containing planned tasks and resources
Minimum chance before integration in capacity
Tentative allocation affecting utilization
Displays impact of quotations on resource workload
Project Quote
Correct
Incorrect
Correct answer
Probability Threshold
Correct
Incorrect
Correct answer
Soft Reservations
Correct
Incorrect
Correct answer
Capacity Overview
Correct
Incorrect
Correct answer
Question 120 of 215
Category: APMF – Capacity overview
Match the Capacity Overview elements with descriptions.
Indicates how much a resource is used
Total hours assigned to a resource
Remaining hours a resource can work
Highlighted in red
Utilization %
Correct
Incorrect
Correct answer
Allocated Hours
Correct
Incorrect
Correct answer
Available Hours
Correct
Incorrect
Correct answer
Overloaded Resources
Correct
Incorrect
Correct answer
Question 121 of 215
Category: APMF – Configuration
Match configuration settings with their functions.
Determines Gantt chart duration
Defines calendar format
Sets default milestone parameters
Controls task dependency rules
Period Unit
Correct
Incorrect
Correct answer
Week Numbering
Correct
Incorrect
Correct answer
Milestone Creation
Correct
Incorrect
Correct answer
Task Planning Settings
Correct
Incorrect
Correct answer
Question 122 of 215
Category: APMF – Schedule Tasks and Planning
Sort the steps to adjust capacity based on project quotations.
Reorder
Open resource planning
Move "Open resource planning" down
Move "Open resource planning" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Reallocate resources if needed
Move "Reallocate resources if needed" down
Move "Reallocate resources if needed" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Analyze utilization percentage
Move "Analyze utilization percentage" down
Move "Analyze utilization percentage" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Enable project quotation integration
Move "Enable project quotation integration" down
Move "Enable project quotation integration" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Question 123 of 215
Category: APMF – Create new tasks
What is required to create a summary task?
Question 124 of 215
Category: APMF – Competencies
Match actions with their competency effects.
Links a skill to an employee
Shows only qualified resources
Ensures correct resource allocation
Updates employee skill records
Assign Competency
Correct
Incorrect
Correct answer
Enable Competency Filtering
Correct
Incorrect
Correct answer
Match Competency
Correct
Incorrect
Correct answer
Modify Competency
Correct
Incorrect
Correct answer
Question 125 of 215
Category: APMF – View options
What is one of the key view options in task planning?
Question 126 of 215
Category: APMF – Critical path
Sort the steps for recalculating the critical path.
Reorder
Verify critical tasks
Move "Verify critical tasks" down
Move "Verify critical tasks" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Enable 'Recalculate on Publish'
Move "Enable 'Recalculate on Publish'" down
Move "Enable 'Recalculate on Publish'" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Adjust project timeline
Move "Adjust project timeline" down
Move "Adjust project timeline" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Publish task planning
Move "Publish task planning" down
Move "Publish task planning" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Question 127 of 215
Category: APMF – Item Requirements and Item Tracking
Arrange the steps to track item availability.
Reorder
Check the item tracking icon in the task planning to check item availability
Move "Check the item tracking icon in the task planning to check item availability" down
Move "Check the item tracking icon in the task planning to check item availability" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Add item requirements to the project plan
Move "Add item requirements to the project plan" down
Move "Add item requirements to the project plan" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Enable item tracking in chart preferences
Move "Enable item tracking in chart preferences" down
Move "Enable item tracking in chart preferences" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Create a purchase order for the item requirement
Move "Create a purchase order for the item requirement" down
Move "Create a purchase order for the item requirement" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Question 128 of 215
Category: APMF – Intercompany projects
What are the benefits of visual linking between intercompany projects?
Select the three correct answers to score the point.
Question 129 of 215
Category: APMF – Item Requirements and Item Tracking
What must be done after adding item requirements to the WBS?
Question 130 of 215
Category: APMF – Chart preferences
Match chart preferences with their descriptions.
Displays or hides completed tasks
Adjusts the Gantt chart interval
Compares with previous versions
Includes tentative resource bookings
Show Task Toggle
Correct
Incorrect
Correct answer
Period View
Correct
Incorrect
Correct answer
Baseline Selection
Correct
Incorrect
Correct answer
Soft Reservations
Correct
Incorrect
Correct answer
Question 131 of 215
Category: APMF – Schedule Tasks and Planning
How can project quotations impact resource planning?
Select the three correct answers to score the point.
Question 132 of 215
Category: APMF – Solution introduction
Match the project components with their definitions.
Significant project event
Visual timeline
Assigning tasks
Identifying risks
Milestone
Correct
Incorrect
Correct answer
Gantt Chart
Correct
Incorrect
Correct answer
Resource Allocation
Correct
Incorrect
Correct answer
Risk Management
Correct
Incorrect
Correct answer
Question 133 of 215
Category: APMF – Configuration
What happens when you close an activity?
Question 134 of 215
Category: APMF – Critical path
What does the critical path represent?
Question 135 of 215
Category: APMF – Introduction Resource planning
Match resource assignment strategies with their effects.
Requires direct user allocation of hours
Uses all available working hours
Spreads workload across available days
Allocates a specific portion of workload
Manual Assignment
Correct
Incorrect
Correct answer
Full Capacity
Correct
Incorrect
Correct answer
Distribute Evenly
Correct
Incorrect
Correct answer
Capacity Percentage
Correct
Incorrect
Correct answer
Question 136 of 215
Category: APMF – Update Assignments on Publish
Sort the steps to update resource assignments after changing task duration.
Reorder
Publish the plan
Move "Publish the plan" down
Move "Publish the plan" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Change task duration in task planning
Move "Change task duration in task planning" down
Move "Change task duration in task planning" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Reassign any remaining unallocated hours
Move "Reassign any remaining unallocated hours" down
Move "Reassign any remaining unallocated hours" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Check resource allocation changes
Move "Check resource allocation changes" down
Move "Check resource allocation changes" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Question 137 of 215
Category: APMF – Introduction Resource planning
Which factors impact resource allocation?
Please select the three correct answers to score the point.
Question 138 of 215
Category: APMF – Critical path
Arrange the steps to analyze the critical path.
Reorder
Enable critical path view
Move "Enable critical path view" down
Move "Enable critical path view" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Review task dependencies
Move "Review task dependencies" down
Move "Review task dependencies" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Open task planning
Move "Open task planning" down
Move "Open task planning" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Adjust scheduling as needed
Move "Adjust scheduling as needed" down
Move "Adjust scheduling as needed" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Question 139 of 215
Category: APMF – Introduction Resource planning
What is the main function of resource planning?
Question 140 of 215
Category: APMF – Allocation distribution
Match the allocation types with their descriptions.
Allocates evenly over time
Allows flexible load balancing
Assigns hours to specific periods
Uses task duration for allocation
Linear Distribution
Correct
Incorrect
Correct answer
Curve Distribution
Correct
Incorrect
Correct answer
Fixed Allocation
Correct
Incorrect
Correct answer
Percentage-Based
Correct
Incorrect
Correct answer
Question 141 of 215
Category: APMF – Hours and progress
Which colors represent effort utilization in task planning?
Select the three correct answers to score the point.
Question 142 of 215
Category: APMF – Icons and legends
What do icons in task planning indicate?
Question 143 of 215
Category: APMF – Configuration
Which settings can be configured in Project Management?
Select the three correct answers to score the point.
Question 144 of 215
Category: APMF – Item Requirements and Item Tracking
Where can you add an item requirement in task planning?
Question 145 of 215
Category: APMF – Create new tasks
What happens when you create a new task?
Question 146 of 215
Category: APMF – Compare with a baseline
What can be compared in a baseline?
Select all three correct answers to score the point.
Question 147 of 215
Category: APMF – Introduction Resource planning
What does the histogram represent in resource planning?
Question 148 of 215
Category: APMF – Allocation distribution
What is an allocation distribution?
Question 149 of 215
Category: APMF – Edit Assignment Form
Arrange the steps to allocate hours using the Edit Assignment Form.
Reorder
Enter or distribute hours
Move "Enter or distribute hours" down
Move "Enter or distribute hours" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Confirm assignment
Move "Confirm assignment" down
Move "Confirm assignment" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
View general task and resource details
Move "View general task and resource details" down
Move "View general task and resource details" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Double-click on an activity
Move "Double-click on an activity" down
Move "Double-click on an activity" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Question 150 of 215
Category: APMF – Schedule Tasks and Planning
Match project quotation actions with their effects.
Includes tentative hours in planning
Modifies when quotations are included
Assigns staff based on quotation details
Identifies workload adjustments
Enable Soft Reservations
Correct
Incorrect
Correct answer
Adjust Threshold
Correct
Incorrect
Correct answer
Allocate Resources
Correct
Incorrect
Correct answer
Review Utilization
Correct
Incorrect
Correct answer
Question 151 of 215
Category: APMF – Capacity simulation
Match actions with their effects in simulation.
Changes utilization distribution
Shows impact before publishing
Highlights allocation differences
Reverts to original plan
Move Activity
Correct
Incorrect
Correct answer
Enable Simulation
Correct
Incorrect
Correct answer
Review Delta Icons
Correct
Incorrect
Correct answer
Discard Changes
Correct
Incorrect
Correct answer
Question 152 of 215
Category: APMF – Icons and legends
Which aspects can be filtered in task planning?
Select the three correct answers to score the point.
Question 153 of 215
Category: APMF – Create new tasks
Which steps are necessary to split an activity?
Select the three correct answers to score the point.
Question 154 of 215
Category: APMF – Capacity overview
Sort the steps to adjust overallocated resources.
Reorder
Identify overloaded resources
Move "Identify overloaded resources" down
Move "Identify overloaded resources" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Check updated capacity overview
Move "Check updated capacity overview" down
Move "Check updated capacity overview" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Reassign activities to other resources
Move "Reassign activities to other resources" down
Move "Reassign activities to other resources" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Open the resource planning for the overloaded resource
Move "Open the resource planning for the overloaded resource" down
Move "Open the resource planning for the overloaded resource" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Question 155 of 215
Category: APMF – Intercompany projects
Match intercompany project elements with their descriptions.
Defines the connection between legal entities
A visual connection between tasks
Allows task visibility across companies
Defines the company associated with a project
Intercompany Relationship
Correct
Incorrect
Correct answer
Soft Link
Correct
Incorrect
Correct answer
Intercompany Task Planning
Correct
Incorrect
Correct answer
Legal Entity Selection
Correct
Incorrect
Correct answer
Question 156 of 215
Category: APMF – Capacity simulation
Sort the steps to analyze resource impact.
Reorder
Enable simulation mode
Move "Enable simulation mode" down
Move "Enable simulation mode" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Decide on adjustments
Move "Decide on adjustments" down
Move "Decide on adjustments" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Review delta icons
Move "Review delta icons" down
Move "Review delta icons" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Compare planned vs. actual
Move "Compare planned vs. actual" down
Move "Compare planned vs. actual" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Question 157 of 215
Category: APMF – Introduction Resource planning
Which actions can be performed using the Edit Assignment Form?
Please select the three correct answers to score the point.
Question 158 of 215
Category: APMF – Competencies
Match competency-related terms with their definitions.
Skills needed for a task
Skills assigned to an employee
Where employee competencies are managed
Where required competencies are assigned
Competency Requirement
Correct
Incorrect
Correct answer
Resource Competency
Correct
Incorrect
Correct answer
HR Module
Correct
Incorrect
Correct answer
Task Planning
Correct
Incorrect
Correct answer
Question 159 of 215
Category: APMF – Chart preferences
Which options are available in Chart Preferences?
Select all three correct answers to score the point.
Question 160 of 215
Category: APMF – Project Quotations
What happens when a project quote exceeds the configured probability threshold?
Question 161 of 215
Category: APMF – Competencies
Which factors determine resource competency matching?
Select the two correct answers to score the point.
Question 162 of 215
Category: APMF – Hours and progress
Match hour tracking terms with their definitions.
Hours recorded in an hour journal
Total estimated work required
Work completed vs. total effort
Visual indicator of effort progress
Posted Hours
Correct
Incorrect
Correct answer
Effort in Hours
Correct
Incorrect
Correct answer
Progress Percentage
Correct
Incorrect
Correct answer
Estimated Planning Status
Correct
Incorrect
Correct answer
Question 163 of 215
Category: APMF – Sub and Multiple Projects
Which actions can be performed when working with multiple projects?
Select the three correct answers to score the point.
Question 164 of 215
Category: APMF – Intercompany projects
Sort the steps to manage intercompany project visibility.
Reorder
Adjust soft links as needed
Move "Adjust soft links as needed" down
Move "Adjust soft links as needed" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Open task planning
Move "Open task planning" down
Move "Open task planning" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Review intercompany-linked tasks
Move "Review intercompany-linked tasks" down
Move "Review intercompany-linked tasks" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Enable intercompany visualization
Move "Enable intercompany visualization" down
Move "Enable intercompany visualization" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Question 165 of 215
Category: APMF – Capacity simulation
What do delta icons indicate in Capacity Simulation?
Question 166 of 215
Category: APMF – Introduction and agenda
Which functionalities are included in the task planning section?
Select all three correct answers to score the point.
Question 167 of 215
Category: APMF – Progress Calculation Method
Arrange the steps for calculating progress percentage.
Reorder
Define effort in hours
Move "Define effort in hours" down
Move "Define effort in hours" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Determine effort to complete
Move "Determine effort to complete" down
Move "Determine effort to complete" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Calculate completed percentage
Move "Calculate completed percentage" down
Move "Calculate completed percentage" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Post actual hours worked
Move "Post actual hours worked" down
Move "Post actual hours worked" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Question 168 of 215
Category: APMF – View options
Arrange the steps to filter task planning data.
Reorder
Click filter button
Move "Click filter button" down
Move "Click filter button" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Select criteria
Move "Select criteria" down
Move "Select criteria" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Save filter settings
Move "Save filter settings" down
Move "Save filter settings" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Apply filter
Move "Apply filter" down
Move "Apply filter" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Question 169 of 215
Category: APMF – Progress Calculation Method
Match progress calculation values with their descriptions.
Total estimated work required
Hours already recorded
Current completion level
Remaining work to be done
Effort in Hours
Correct
Incorrect
Correct answer
Posted Hours
Correct
Incorrect
Correct answer
Progress Percentage
Correct
Incorrect
Correct answer
Effort to Complete
Correct
Incorrect
Correct answer
Question 170 of 215
Category: APMF – Capacity overview
Match the filtering options with their functions.
Filter by specific job functions
Show data for a selected timeframe
Filter by type of project
Hours from project quotations
Resource Role
Correct
Incorrect
Correct answer
Time Period
Correct
Incorrect
Correct answer
Project Type
Correct
Incorrect
Correct answer
Soft Reservations
Correct
Incorrect
Correct answer
Question 171 of 215
Category: APMF – Critical path
Match critical path components with their meanings.
Sequence of tasks determining project duration
Available slack for non-critical tasks
Links between tasks affecting scheduling
Time required to complete a task
Critical Path
Correct
Incorrect
Correct answer
Float Time
Correct
Incorrect
Correct answer
Dependencies
Correct
Incorrect
Correct answer
Task Duration
Correct
Incorrect
Correct answer
Question 172 of 215
Category: APMF – Capacity simulation
Arrange the steps to simulate capacity changes.
Reorder
Open Task Planning
Move "Open Task Planning" down
Move "Open Task Planning" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Adjust resource assignments
Move "Adjust resource assignments" down
Move "Adjust resource assignments" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Review updated utilization
Move "Review updated utilization" down
Move "Review updated utilization" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Enable Simulation Mode
Move "Enable Simulation Mode" down
Move "Enable Simulation Mode" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Question 173 of 215
Category: APMF – Allocation distribution
Which actions can you perform with an allocation distribution?
Select all three correct answers to score the point.
Question 174 of 215
Category: APMF – Project Quotations
Where are project quotations integrated?
Question 175 of 215
Category: APMF – Edit Assignment Form
Which options are available for assigning hours?
Select the three correct answers to score the point.
Question 176 of 215
Category: APMF – Configuration
What does the period unit and Length of period setting control?
Question 177 of 215
Category: APMF – Intercompany projects
Arrange the steps to display an intercompany project.
Reorder
Create an intercompany project
Move "Create an intercompany project" down
Move "Create an intercompany project" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Define the legal entity
Move "Define the legal entity" down
Move "Define the legal entity" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Link project visually
Move "Link project visually" down
Move "Link project visually" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Enable intercompany display in chart preferences
Move "Enable intercompany display in chart preferences" down
Move "Enable intercompany display in chart preferences" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Question 178 of 215
Category: APMF – Create new tasks
Sort the steps for splitting an activity.
Reorder
Adjust task details
Move "Adjust task details" down
Move "Adjust task details" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Paste as new task
Move "Paste as new task" down
Move "Paste as new task" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Select activity to split
Move "Select activity to split" down
Move "Select activity to split" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Use Cut action
Move "Use Cut action" down
Move "Use Cut action" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Question 179 of 215
Category: APMF – View options
Arrange the steps to customize a Gantt chart view.
Reorder
Enable filters
Move "Enable filters" down
Move "Enable filters" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Open Chart Preferences
Move "Open Chart Preferences" down
Move "Open Chart Preferences" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Save settings
Move "Save settings" down
Move "Save settings" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Adjust view range
Move "Adjust view range" down
Move "Adjust view range" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Question 180 of 215
Category: APMF – Item Requirements and Item Tracking
Sort the steps to transfer item requirements from WBS.
Reorder
Use the Transfer from WBS estimates action
Move "Use the Transfer from WBS estimates action" down
Move "Use the Transfer from WBS estimates action" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Select the project
Move "Select the project" down
Move "Select the project" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Select the items which should be transferred
Move "Select the items which should be transferred" down
Move "Select the items which should be transferred" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Check the item requirements on the project
Move "Check the item requirements on the project" down
Move "Check the item requirements on the project" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Question 181 of 215
Category: APMF – Create new tasks
Arrange the steps to create a new task.
Reorder
Select task position
Move "Select task position" down
Move "Select task position" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Enter task details
Move "Enter task details" down
Move "Enter task details" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Open task planning
Move "Open task planning" down
Move "Open task planning" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Save the task
Move "Save the task" down
Move "Save the task" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Question 182 of 215
Category: APMF – Edit Assignment Form
Match assignment methods with their descriptions.
Allocates maximum available hours to a task
Assigns only the free available hours
Allows entering hours manually
Evenly spreads hours over selected days
Full Capacity
Correct
Incorrect
Correct answer
Remaining Capacity
Correct
Incorrect
Correct answer
Manual Entry
Correct
Incorrect
Correct answer
Distribute Action
Correct
Incorrect
Correct answer
Question 183 of 215
Category: APMF – Update Assignments on Publish
What are the possible effects of moving an activity?
Select the three correct answers to score the point.
Question 184 of 215
Category: APMF – Allocation distribution
Sort the steps of defining allocation percentages.
Reorder
Validate total allocation (100%)
Move "Validate total allocation (100%)" down
Move "Validate total allocation (100%)" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Choose duration period
Move "Choose duration period" down
Move "Choose duration period" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Apply to resource
Move "Apply to resource" down
Move "Apply to resource" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Set allocation percentage
Move "Set allocation percentage" down
Move "Set allocation percentage" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Question 185 of 215
Category: APMF – Hours and progress
How are hours posted on an activity?
Question 186 of 215
Category: APMF – Histogram Icons and Filters
Match filter types with their functions.
Displays only overloaded resources
Shows fully or partially staffed tasks
Filters tasks based on completion percentage
Highlights available or unavailable resources
Overload Filter
Correct
Incorrect
Correct answer
Staffing Status
Correct
Incorrect
Correct answer
Task Progress Filter
Correct
Incorrect
Correct answer
Resource Availability
Correct
Incorrect
Correct answer
Question 187 of 215
Category: APMF – Allocation distribution
Match the distribution methods with their key features.
Requires user input for each step
Follows preset distribution models
Assigns based on task rules
Depends on availability of resources
Manual Allocation
Correct
Incorrect
Correct answer
Predefined Curves
Correct
Incorrect
Correct answer
Auto Distribution
Correct
Incorrect
Correct answer
Resource-Based
Correct
Incorrect
Correct answer
Question 188 of 215
Category: APMF – Histogram Icons and Filters
What can be displayed in the histogram?
Select the three correct answers to score the point.
Question 189 of 215
Category: APMF – Update Assignments on Publish
Match resource planning actions with their outcomes.
Adjusts schedule and potentially impacts assignments
Applies updates to resource planning
Identifies missing resource assignments
Balances workload after schedule updates
Move Activity
Correct
Incorrect
Correct answer
Publish Changes
Correct
Incorrect
Correct answer
Check Unallocated Hours
Correct
Incorrect
Correct answer
Adjust Resource Capacity
Correct
Incorrect
Correct answer
Question 190 of 215
Category: APMF – Histogram Icons and Filters
What does a red-colored resource in the histogram indicate?
Question 191 of 215
Category: APMF – Task planning
What is the purpose of task planning?
Question 192 of 215
Category: APMF – Solution introduction
Which of the following features are part of the solution?
Select all three correct answers to score the point.
Question 193 of 215
Category: APMF – Intercompany projects
Which steps are required to set up an intercompany project?
Select the three correct answers to score the point.
Question 194 of 215
Category: APMF – Update Assignments on Publish
What happens when you move an activity in task planning?
Question 195 of 215
Category: APMF – Sub and Multiple Projects
Arrange the steps to link a milestone from one project to another.
Reorder
Select the milestone in the main project
Move "Select the milestone in the main project" down
Move "Select the milestone in the main project" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Create a link with a defined delay
Move "Create a link with a defined delay" down
Move "Create a link with a defined delay" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Publish the changes for both projects
Move "Publish the changes for both projects" down
Move "Publish the changes for both projects" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Choose the target activity in the subproject
Move "Choose the target activity in the subproject" down
Move "Choose the target activity in the subproject" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Question 196 of 215
Category: APMF – Intercompany projects
What is an intercompany project?
Question 197 of 215
Category: APMF – Introduction Resource planning
Arrange the steps to allocate tasks using Full Capacity.
Reorder
Drag and drop using Full Capacity
Move "Drag and drop using Full Capacity" down
Move "Drag and drop using Full Capacity" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Confirm allocation
Move "Confirm allocation" down
Move "Confirm allocation" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Select the activity
Move "Select the activity" down
Move "Select the activity" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Choose a resource
Move "Choose a resource" down
Move "Choose a resource" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Question 198 of 215
Category: APMF – Solution introduction
Which views are available in the project management solution?
Select all three correct answers to score the point.
Question 199 of 215
Category: APMF – Introduction Resource planning
Arrange the steps to manually reallocate unassigned hours.
Reorder
Select a resource
Move "Select a resource" down
Move "Select a resource" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Confirm the allocation
Move "Confirm the allocation" down
Move "Confirm the allocation" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Identify unallocated hours
Move "Identify unallocated hours" down
Move "Identify unallocated hours" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Drag and drop to allocate
Move "Drag and drop to allocate" down
Move "Drag and drop to allocate" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Question 200 of 215
Category: APMF – Progress Calculation Method
What does the progress calculation method determine?
Question 201 of 215
Category: APMF – Draft and publish
Match publishing process steps with their functions.
Verify task updates
Label the version
Finalize the changes
Revert to previous version
Review Changes
Correct
Incorrect
Correct answer
Add Version Name
Correct
Incorrect
Correct answer
Confirm Publish
Correct
Incorrect
Correct answer
Discard Draft
Correct
Incorrect
Correct answer
Question 202 of 215
Category: APMF – Update Assignments on Publish
Match update assignment options with their effects.
Moves assigned hours to the new schedule
Removes hours outside the new activity window
Allows users to reassign unallocated hours
Leaves the schedule unchanged
Reassign Hours
Correct
Incorrect
Correct answer
Cancel Assignments
Correct
Incorrect
Correct answer
Manual Reallocation
Correct
Incorrect
Correct answer
Keep Original Assignments
Correct
Incorrect
Correct answer
Question 203 of 215
Category: APMF – Introduction Resource planning
Arrange the steps to create and apply a resource filter.
Reorder
Open resource planning
Move "Open resource planning" down
Move "Open resource planning" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Apply the filter
Move "Apply the filter" down
Move "Apply the filter" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Select filter criteria
Move "Select filter criteria" down
Move "Select filter criteria" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
View filtered resources
Move "View filtered resources" down
Move "View filtered resources" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Question 204 of 215
Category: APMF – Compare with a baseline
Sort the steps to analyze baseline changes.
Reorder
Open chart preferences
Move "Open chart preferences" down
Move "Open chart preferences" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Adjust planning if needed
Move "Adjust planning if needed" down
Move "Adjust planning if needed" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Highlight differences
Move "Highlight differences" down
Move "Highlight differences" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Select previous baseline
Move "Select previous baseline" down
Move "Select previous baseline" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Question 205 of 215
Category: APMF – Draft and publish
Which features are available in draft mode?
Select all three correct answers to score the point.
Question 206 of 215
Category: APMF – Item Requirements and Item Tracking
Which documents are involved in item tracking?
Select the three correct answers to score the point.
Question 207 of 215
Category: APMF – Sub and Multiple Projects
Sort the steps to enable and display multiple projects.
Reorder
Open chart preferences
Move "Open chart preferences" down
Move "Open chart preferences" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
View projects in a single task plan
Move "View projects in a single task plan" down
Move "View projects in a single task plan" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Select multiple projects from the project list
Move "Select multiple projects from the project list" down
Move "Select multiple projects from the project list" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Reorder
Enable 'Include Linked Projects'
Move "Enable 'Include Linked Projects'" down
Move "Enable 'Include Linked Projects'" up
answer is
Correct
is the
Correct Answer
answer is
Incorrect
Question 208 of 215
Category: APMF – Introduction Resource planning
Which filters can be applied in resource planning?
Please select the three correct answers to score the point.
Question 209 of 215
Category: APMF – Competencies
How can you filter resources based on competencies?
Question 210 of 215
Category: APMF – Project Quotations
Which elements can be allocated in project quotations?
Select the three correct answers to score the point.
Question 211 of 215
Category: APMF – Draft and publish
What happens when a task planning is published?
Question 212 of 215
Category: APMF – Critical path
Which options are available when recalculating the critical path?
Select all three correct answers to score the point.
Question 213 of 215
Category: APMF – Hours and progress
Which factors affect the estimated planning status?
Select the three correct answers to score the point.
Question 214 of 215
Category: APMF – Capacity simulation
Match simulation elements with their meanings.
Shows increase or decrease in hours
Indicates resource workload
Allows adjustments before publishing
Activates preview mode
Delta Icon
Correct
Incorrect
Correct answer
Utilization Percentage
Correct
Incorrect
Correct answer
Task Planning
Correct
Incorrect
Correct answer
Simulation Toggle
Correct
Incorrect
Correct answer
Question 215 of 215
Category: APMF – Capacity overview
What does the Capacity Overview show?